Marloth Park Central
Route 02: Marloth Park to Malelane Gate
Gate approach for routes centred on Berg-en-Dal, the H3 corridor and Skukuza.

- Start
- Visitor accommodation or agreed departure point in Marloth Park
- End / circuit
- Malelane Gate entrance area
- Entry gate
- Malelane Gate
- Exit gate
- Not applicable - gate approach
- Distance
- Approximately 35-50 km, depending on the Marloth Park starting point and selected exit
- Minimum time
- Approximately 45-60 minutes without delays
- Planning duration
- Allow 60-90 minutes before planned park entry, including local access, N4 traffic and entry preparation
- Surface
- Local roads vary; external route is mainly tar
- Complexity
- Moderate
- Timing sensitivity
- Moderate
- Return flexibility
- Direct return
- Verification
- 2026-07-09
Ordered road sequence
- Local Marloth Park access road
- Marloth Park Road / Tenbosch Road as signed
- N4 west
- R570 north to Malelane Gate
Visitor instructions
- Leave the accommodation using the signed local road sequence to a Marloth Park exit.
- Use Marloth Park Road or Tenbosch Road according to the selected exit and current signage.
- Join the N4 and travel west toward Malelane.
- Turn onto the signed R570 approach to Malelane Gate.
- Continue to the gate entrance area and prepare identification, booking details and required entry documents.
Important junctions
- Selected Marloth Park exit
- N4 westbound junction
- R570 turn to Malelane Gate
Planned stops
- External service stops are available along the N4; no stop is required by the route
Operational controls
Turnaround: Not applicable. This route ends at the gate entry area.
Return logic: Reverse the R570 and N4 approach, then use the selected Marloth Park entrance and local road sequence.
Gate margin: Depart Marloth Park early enough to complete the external approach and entry process after the official gate opens.
Facilities and limits
Facilities: Do not depend on a specific external stop unless its current operating status is confirmed.
Fuel: Confirm fuel before leaving Marloth Park or use a verified external filling station before entering the park.
Main limitation: N4 travel increases the total day length and is affected by traffic, road works and the selected Marloth Park exit.

